Green Office Initiative in Australia Challenge: High peak electricity charges and carbon decrease requestsSolution: Integrated 100kWh lithium battery system with load-shifting capabilitiesResult: 35% reduction in energy costs and government subsidy s...
Green Office Initiative in Australia
Challenge: High peak electricity charges and carbon decrease requests
Solution: Integrated 100kWh lithium battery system with load-shifting capabilities
Result: 35% reduction in energy costs and government subsidy support